Timetable · CPR 2024
The CPR 2024 timetable seen from an FDES configurator
CPR 2024, the EU Construction Products Regulation, has been in force since 7 January 2025 and has applied since 8 January 2026, but it only reaches your products once the standard for their family has been revised. Environmental indicators then enter the DoPC in stages (2026, 2030, 2032), followed by the digital passport. For an FDES configurator (FDES is the French EPD format, Fiche de Déclaration Environnementale et Sanitaire), nothing needs rebuilding: above all, this timetable tells you when the environmental data it already produces will become a European regulatory obligation.
This guide is for construction product manufacturers and environmental managers who have, or are considering, an FDES configurator and want to know what CPR 2024 changes for their data, and when.
Contents
CPR 2024 is Regulation (EU) 2024/3110 on construction products, the Construction Products Regulation that replaces the 2011 regulation. Its key dates are set; what remains open is when each product family switches over to it. This guide goes through each deadline and explains, every time, what it changes for a manufacturer that produces its FDES with a configurator.
The CPR 2024 timetable at a glance
Six dates structure CPR 2024: publication at the end of 2024, entry into force in January 2025, application in January 2026, penalties in January 2027, new environmental indicators in 2030 and then 2032, and the end of the transition in 2040 at the latest.
| Date | What happens | What it changes for a configurator |
|---|---|---|
| 18 December 2024 | Publication in the Official Journal of the EU | Nothing immediate: the framework is in place. |
| 7 January 2025 | Entry into force | Time to check that your LCA data is structured by variant. |
| 8 January 2026 | The regulation applies, family by family; climate change enters the DoPC | The four climate indicators in your FDES become declarable in the DoPC as soon as your standard is revised. |
| 8 January 2027 | Penalty regime applies | An incorrect DoPC becomes subject to penalties: traceability of calculations matters. |
| 9 January 2030 | Nine more environmental indicators | Indicators that your EN 15804+A2-compliant FDES already calculate. |
| 9 January 2032 | The final six indicators | Likewise: the data exists, you need to be able to export it. |
| 2040 at the latest | End of coexistence with the 2011 regulation | Every family has moved over to CPR 2024. |
The digital product passport does not have a date yet: it depends on a delegated act from the Commission, followed by an 18-month period.
2025-2026: a regulation in force, but not yet for all your products
CPR 2024 has applied since 8 January 2026, but a product only moves over when the harmonised technical specification for its family is revised under the new regulation. Until then, it remains under the 2011 regulation, with its declaration of performance (DoP).
This family-by-family switchover follows a work programme, known as the CPR Acquis process, which sets the order in which standards are revised. Each family then benefits from a coexistence period between the old and the new harmonised standard. The French Ministry for the Ecological Transition sums up the situation: the two regulations coexist until 2040.
For a configurator, then, the question is not “when does the CPR apply?” but “when will the standard for my family be revised?”. That is what triggers the DoPC and its indicators.
When do environmental indicators enter the DoPC?
In three stages set by the regulation: climate change from 8 January 2026, nine other impacts from 9 January 2030, and the final six from 9 January 2032. Each stage only applies to a family once its harmonised technical specification has been published.
| Stage | From | Characteristics (Annex II of CPR 2024) |
|---|---|---|
| 1 | 8 January 2026 | Climate change: total, fossil, biogenic, land use and land use change |
| 2 | 9 January 2030 | Ozone depletion, acidification, eutrophication (freshwater, marine, terrestrial), photochemical ozone formation, abiotic resource depletion (minerals and metals, fossil fuels), water use |
| 3 | 9 January 2032 | Particulate matter, ionising radiation, freshwater ecotoxicity, human toxicity (cancer and non-cancer effects), land use related impacts |
These values cover the product’s entire life cycle, packaging included. The DoPC refers to the calculation software made available by the Commission, and in it the manufacturer declares that its sustainability data has been calculated according to the applicable product category rules.
The digital passport: a delegated act, then 18 months
The digital passport for construction products does not yet have a mandatory date. The Commission must first set out how it works in a delegated act; manufacturers will then have 18 months to make the passport available through the system provided for by CPR 2024.
The passport will contain, among other things, the DoPC. In other words, environmental indicators will follow the same path: calculated from your LCA data, declared in the DoPC, then accessible through the data carrier affixed to the product.
What CPR 2024 changes for an FDES configurator
Nothing to rebuild, but three points to get right: data per variant, traceable calculations and export capability. An FDES configurator already produces the raw material of the DoPC; it is its outputs that will need to adapt to the new uses.
- One value per variant. The DoPC relates to an identified product, with its variants. A configurator calculates each variant instead of a range average: exactly the level of detail expected.
- Traceable calculations. With the penalty regime, every declared value must be justifiable. Versioning of the model, parameters and results, already required for configurator verification, becomes a regulatory asset.
- Exports that need to evolve. FDES are currently output as PDF and as XML for INIES. Tomorrow, they will need to feed the Commission’s software, then the digital passport, in the formats these set.
- Watching your family. The right time to act depends on the revision of your standard: that is what you need to follow, more than the regulation’s headline dates.
What should you do now?
Structure the environmental data for your range without waiting for your family’s rules: it is useful straight away for your FDES and for RE2020, and it will be the foundation of your DoPCs and passports.
- Take stock of your FDES: which products are covered, by which declarations, with which assumptions.
- Identify your harmonised standard and follow its revision under CPR 2024.
- Check that your data is structured by variant, not just locked away in PDFs.
- Keep a record of every calculation: model version, parameters, results.
- Plan for export: your results will need to flow to systems other than the INIES database.
Sources and references
Figures marked as illustrative are neither market prices nor Ailoop rates.
- FPS Economy (Belgium): environmental characteristics of construction products (updated 21 August 2025)
- FPS Economy (Belgium): declaration of performance and conformity and CE marking
- FPS Economy (Belgium): the digital product passport for construction products
- French Ministry for the Ecological Transition: the Construction Products Regulation
- FFB (French Building Federation): “Construction Products Regulation: a timetable and open questions” (11 June 2025, in French)
- Regulation (EU) 2024/3110 of 27 November 2024 (EUR-Lex)
Frequently asked questions
Does CPR 2024 already apply to my products?
Only if the harmonised technical specification for their family has been revised under the new regulation. CPR 2024 has applied since 8 January 2026, but family by family: until the standard for your family is revised, your products remain under the 2011 regulation and their declaration of performance (DoP).
When does carbon impact become mandatory in the DoPC?
The four climate change indicators (total, fossil, biogenic, land use) can be required from 8 January 2026, as soon as the harmonised technical specification for your family provides for them. The next nine indicators follow from 9 January 2030, and the final six from 9 January 2032.
Until when does the old regulation remain applicable?
The two regulations coexist during the transition, which ends in 2040 at the latest. Each family switches over when its standard is revised, with a coexistence period between the old and the new harmonised standard.
When does the digital passport become mandatory?
No date has been set. The Commission must first adopt a delegated act establishing the passport system for construction products; manufacturers will then have 18 months to make their passport available.
Do you need to rebuild your FDES configurator for CPR 2024?
No. An FDES configurator already calculates, for every variant, the EN 15804+A2 indicators on which the DoPC relies. You will, however, need to follow the rules for your product family, the Commission’s calculation software and the passport formats, and adapt the exports once they are published.
Does CPR 2024 replace FDES for RE2020?
No. For RE2020, the French environmental regulation for new buildings, FDES and the INIES programme remain the reference. CPR 2024 adds a European regulatory declaration, the DoPC; both rest on the life cycle assessment of the same product.
Further reading
The timetable is known, the rules for your family not yet. Your data, however, can be ready.
Let’s talk about your products, your FDES and how your environmental data is produced today. We will tell you what will be useful for the DoPC and the passport, and what remains to be followed.
